Little Creek Stormwater Management Facility Cleanout
Consultation has concluded
Stormwater management facilities are designed to capture stormwater runoff from roadways and adjacent properties and improve the quality of the water before releasing it to a natural watercourse. This is achieved by capturing the water in the facility for a desired length of time allowing sand, salt, and other pollutants to settle to the bottom. Over time, the sediment accumulates to a point where removal is required to reinstate design functionality and storage capacity for large storm events.
Great care has been taken to identify wildlife, including protected species, living in and around the facility. Any required relocations will be undertaken by a person licenced with the Ministry of Natural Resources and Forestry.
The Municipality of Central Elgin has retained the services of Matrix Solutions Inc. (formerly EcoSystem Recovery) and Lancoa Contracting Incorporated to undertake this rehabilitation project. Matrix Solutions Inc. has been responsible for the engineering design, sediment analysis testing, ecological review, and erosion and sediment control plan for this project. Matrix Solutions will have an inspector on site along with Municipality staff for construction inspection and to assist with any resident concerns.